News, NHS trust

Chesterfield Royal independent digital capability and opportunity review, plans for PAS replacement

Chesterfield Royal Hospital NHS Foundation Trust has shared findings from an independent review of its digital capability and opportunities, establishing that whilst important digital foundations such as EPR and clinical digital leadership are in place; these are “not yet operating as consistently established organisational capacity”.

Headline findings for each of the nine domains assessed include that priorities and strategic alignment are not yet in place in terms of a DDaT vision; refreshed governance is in place but consistent application and decision discipline now need embedding; “strong expertise” is available in digital across the workforce, but dependent on limited individuals and temporary arrangements; and EPR offers a platform but foundational workflow, configuration, and adoption issues need stabilising before transformation.

A score of two – developing – was awarded across the board, with the review noting “clear intent, real activity, and pockets of good practice”, but a lack of consistent, documented, and organisation-wide application needed to satisfy level three. Only one data protection officer is available to cover the whole trust, it pinpoints, and there is as yet no consistent approach to AI adoption, with staff using Copilot and other AI tools “without clear guidance”.

Five critical actions are outlined to be completed within 90 days, covering the agreement of a shared DDaT vision and priorities, the confirmation of sustainable arrangements for clinical digital and business critical DDaT capacity, a clarification of accountability, a PAS replacement programme, and the creation of a single portfolio view to identify what moves forward, waits, or stops.

Five further actions are then indicated for completion: improving trusted information through BI recovery; building a single view of every system’s renewal data, usage, dependencies, and full running costs to understand the full costs of digital and how to get value from what is already in place; and prioritising EPR and clinical workflow changes that meet evidenced needs. Interim guidance should be offered on the safe use of Copilot and AI tools, with a consistent approach to AI adoption, and patients and carers should be engaged in digital design, it adds.

The board also presents an outline business case proposing the replacement of the existing trust patient administration system (PAS), with the contract currently due to end in September 2028. Following an initial option appraisal, the preferred route is to develop a replacement system based on the Nervecentre solution, which would simplify trust digital architecture and strengthen EPR integration, reducing the reliance on multiple suppliers, it indicates.

Current estimates put capital costs for the programme at £6.3 million, together with associated implementation, migration, testing, training, and business change resources. “Failure to proceed with PAS replacement would expose the trust to significant operational, clinical, financial and reporting risks,” according to the board. “These include the inability to operate a supported PAS beyond the current contract period, continued dependency on a fragmented digital architecture, risks to patient administration processes, challenges in maintaining reporting and performance management capability, potential impacts on income assurance and reduced ability to realise wider EPR optimisation benefits.”

The trust puts forward its case for change, highlighting operational continuity, patient safety, clinical workflow, data quality, interoperability, benefits realisation, and the need to reduce complexity across patient administration, referrals, reporting, and downstream system integration. “The current split between systems has created issues around Admit, Discharge & Transfer (ADT) messaging, Patient Demographic Service (PDS), patient merges, correspondence addresses, NHS e-Referral Service (e-RS) API functionality and downstream reporting dependencies,” it says. Consideration will also be made for the replacement of two further systems due for replacement during this period: the trust’s theatre system and its patient portal, which are both available as bolt-ons through its existing Nervecentre EPR contract.

Ambitions would be to complete build, configuration, data migration design, integration design, and early testing by September 2027, the board continues, with full testing, training preparation, reporting readiness, operational readiness, data migration validation, and cutover planning to be worked on from October 2027 to June 2028. July to September 2028 will then focus on final deployment, stabilisation, and legacy transition, before the system goes live in September prior to the current contract end.

The Nervecentre EPR full business case identified £10.5 million of cash-releasing benefits over the programme lifecycle, the trust notes, with the largest benefits remaining dependent on further digitisation, reduced paper reliance, and ambient voice technology progress. PAS replacement is therefore not a standalone technical refresh, it continues, but a key dependency for completing digital transformation and unlocking benefits from EPR optimisation.

Further work is to be done is on conducting a market assessment looking at available scope, a review of alternative PAS suppliers meeting requirements, value for money, and post-implementation learnings from Nottingham University Hospitals and University Hospitals of Leicester. Indicative costs suggest that recurrent annual costs for PAS, theatres, and patient portal would be £820,000.

Wider trend: Trust digital transformation 

Devon Partnership NHS Trust has shared outcomes from a workforce digital skills and maturity assessment, and outlined plans for ambient voice technology roll out following a frontline productivity funding award. The digital skills assessment covered a range of domains, including basic IT skills, use of productivity applications, familiarity with AI and accessibility tools, and safe digital practices, the trust notes. 15 percent of staff rated their skills as a one or two out of five across five or more areas, Devon Partnership indicates, whilst 26 percent felt they needed more structured support, and 21 percent “could be digital champions”. The biggest identified gap was around the use of digital tools to improve productivity, with over half of staff stating they were either new and unfamiliar, or that they needed significant support.

The Black Country collaborative has launched a system-wide procurement for a remote monitoring and virtual ward solution to support the delivery of a patient-centred model and offer an interface between patients and clinicians, with a total contract value of £3 million. Trusts included in the process are The Dudley Group NHS Foundation Trust, Sandwell and West Birmingham NHS Trust, The Royal Wolverhampton NHS Trust, and Walsall Healthcare NHS Trust. There is the potential also for the award to be expanded to other primary and secondary regional partners such as Birmingham Women’s and Children’s NHS Foundation Trust, The Royal Orthopaedic Hospital NHS Foundation Trust, and University Hospitals Birmingham NHS Foundation Trust.

East and North Hertfordshire Teaching NHS Trust has published a clinical quality strategy 2026-30, and a people strategy to 2029, along with updates on ambient voice tech roll out and the OneEPR programme. For clinical quality, the focus for 2026/27 will be on identifying priority innovations and system dependencies, with AI functionality to be adopted within the trust’s current quality management system, improvements planned for its digital referral system, clinical leadership in the design and adoption of OneEPR, and digital capabilities to be enabled at the point of care to help manage clinical risk. Over 2027/29 a focus will be on embedding safe and reliable OneEPR content to support individualised patient care needs, and for 2028/30 this will be on embedding AI in quality management processes and optimising innovations.